General Conveyor Implementation
|
|
-
In the flow properties, create an object
called part1. uncheck the default image and select an image for
part1. (Brown Dot)
-
Create a start process that creates objects
of type part1. Add 2 generic processes, Load Conveyor and Unload
Conveyor. Add the End process.
-
Connect the flow. When adding the
connection between load conveyor and unload conveyor, expand the
line to include multiple anchor points, then in the connection
line properties edit the connection speed interface.
-
Select Speed based on ft/sec and set the
speed to 2.45, Enable auto distance calculation, and set the
line capacity to 15. The distance of the line is computed based
on the grid settings under the properties menu.
-
In the Behavior interface, select
implemented automated conveyor behavior.
-
Run the simulation, parts are spaced on the
conveyor based on the spacing between parts.
|
|
 |
 |
 |
 |
|  |