Open the flow properties and click on the object creation option. Add a new object type called part1 and add new object type called part2. Check the display object value box.
- Create a start process define the process name to start.
- Select create objects based on distribution then select object type part1 and part2 change both percent to 50.
- Click generic process in process name type process1.
- Change default timing for the minimum 5 and the maximum 10.
- Create another generic process called process2 for the minimum type 2 and the maximum 15.
- Create an end process, in process name type end
- Create a connection from start to process1, process1 to process2, and process2, and then connect to end.
- Click result process check enable wizard value control then click add parameter.
- Display type in Q size, Process select Process1, Value select Q Length, Format select Integer, and for Type select Last then click add parameter.
- For the second line in display type in P2, Process select Process2, Value select Q Length, Format select Integer, and Type select last
- For display type the pull down menu select Vertical Bar in update interval type 30 for time units.
- Click on the new image and drag to resize then select simulation.
- As the objects build up in the queue the results process updates.
|
|
 |
 |
 |
 |
|  |