Warehouse Using Random Pick Simulation
Author: CreateASoft Inc./Friday, October 28, 2016/Categories: Advanced Modeling and Connectivity
Warehouse Racks and Aisles Pt 1
- Create a Start and End process
- Create two processes –
- Rack Module 1
- Rack Module 2
- Select Rack Module 1 –
- Change the timing
- Capacity
- Display settings
- In Display Settings 2D/3D
- Change the 3D Process Image
- Size of the process
- Rotation of the process - this may take some adjusting
- Select Rack Module 2 –
- Change the timing
- Capacity
- Display settings
- In Display Settings 2D/3D
- Change the 3D Process image
- Size of the process
- Rotation, this may take some adjusting
- Select both Modules –
- Process Extension/Event Handling
- Select Object:NextProcessDefined
- Insert and Expression, Edit
- Select NextProcessToStart and type 'End'
- Select each Rack Module
- Convert each to a Base Module
- Select Auto-Create Processes –
- Drag the area
- Change number and direction of processes to the desired
- Apply properties from a module
- Check side-by-side to make the processes up against one another
- Then choose the value to be displayed for the label
- Repeat this process as many times as desired
- To Auto-Create Paths –
- First select the processes to create paths between
- Change Path Type to Create
- Path Direction
- Connector Location
- Process Path, this will be based on the processes you selected
- Finish the connections between all needed processes
- Select the Start process
- Change the Routing Properties to Least Busy/Randomized Routing –
- Evenly distribute work among processes, make sure Connector and End are checked for ignore.
- Go to Flow Properties
- General Properties
- Change the Search Depth to a number greater than the number of processes you have, this ensures that all processes are seen by the routing.
- Run the Simulation
- Go to View - 3D View to switch and see the aisle and racks
Warehouse Racks and Aisles Pt 2
- In order to edit the modules that were created for the racks navigate to Model Build
- Select Smart Module, then hit refresh list to update the module list.
- Select Edit to make adjustments to the modules, this will automatically update all processes that were setup using the module.
- Since Rack Module 1 and Rack Module 2 were converted into Base Modules, they are no longer useful and can be deleted.
- By viewing the Item Properties of a process and extending the window you can see if a process is based on a module and which if so which module.
- Let's make some changes to Rack Module 1
- Change the timing, loading and unloading
- As well as the queue and process capacity
- Now select any process based on Rack Module 1 and notice how the changes have been made.
- Select Resource and Shifts
- Add a new resource called Forklift and add 2 of them
- Select all of the lines between the racks and add Resource Constraints –
- Enable Override and Hold Resources
- Check apply to all as well
- Run the simulation
- Stop the simulation
- Run the simulation