Simcad Pro Training and Tutorials

Categories

On Screen Values, Metrics, Gauges, and Graphs

simulation training & tutorials

Author: CreateASoft Inc./Tuesday, May 27, 2014/Categories: Advanced Modeling and Connectivity

Rate this article:
5.0
  • Begin by adding a Start Process, Generic Process and an End Process.
  • Connect the flow.
  • Add a Results Process underneath Start.
    • Click “Add Parameter” and fill out the table as shown.
    • Change the Display Type to “Vertical Bar.”
    • Select “Use One Maximum Value” and set it to 100.
    • Set the “Update Interval” value to 10 seconds.
    • Make sure your properties match those on the screen.
  • Use the Selection Tool to resize the Results Process..
  • Run the simulation.
  • Double-Click the Generic Process
    • Open its Process Timing Properties.
  • Add another Results Process underneath End.
    • Fill out the information as shown.
    • Set the Display Type to “Line Graph.”
  • Place a third Results Process and put it under the Generic Process.
    • Fill out the information as shown.
    • Select the box labeled “Capture historical data for additional analysis.”
    • Set the Display Type to “Text Values.”
  • Open the “Model Analysis” tab.
  • Scroll down to view the “Model Variables” table.
  • Stop the simulation.
  • Under the “Analysis” tab, you can view results graphs by clicking “Dynamic Data Graphs.”

 

 

Number of views (8327)/Comments (0)